|
#1
|
|||
|
|||
Pump question
I am looking at either doing a closed loop with a sequence dart and a tunze stream (6000) or just using two tunze streams. Not as much flow with the second option, but a lot less plumbing and four less holes to leak. Also the second option is more expensive, but more economical. Any opnions out there?
|
#2
|
|||
|
|||
Closed loop OM super squirt
|
#3
|
|||
|
|||
I am going to put a 4 way on a hammerhead pump. The SS was not rated for the flow that I am going to push
|
|
|