View Single Post
  #6  
Old 01/10/2008, 03:01 PM
mightyreefer mightyreefer is offline
Registered Member
 
Join Date: Jun 2007
Location: Southern California
Posts: 27
That foundation will be strong enough. My only reccomendation would be to put a layer of 1 1/8" ply over the top of it to make sure it distributes the weight as evenly as possible.

You might want to at least consult with an engineer about it. A post tension slab is the worst kind to crack.

where are you going to put the Sump and all the equipment?