That foundation will be strong enough. My only reccomendation would be to put a layer of 1 1/8" ply over the top of it to make sure it distributes the weight as evenly as possible.
You might want to at least consult with an engineer about it. A post tension slab is the worst kind to crack.
where are you going to put the Sump and all the equipment?
|