electrical is done, ductwork is finished and the new vent fan is installed.

Insulaton can now be done. Then building the new walls and roughing in the plumbing and hopefully installing the tub. Plumbing and electrical always take me time because I try to be as safe as possible (electrical) and use as few bends as possible (plumbing). The engineering as I go takes more time then the actual work. Couple that with the morons that did a lot of upgrade work to this house in the past. I spend as much time trying to figure out what they did and removing the sub standard work as doing the job correctly.

Back to work again. I have set a time limit of 1:00 AM which leaves me 2 hours adn 45 minutes to work.

Adam
__________________
Puppies in pet shops mostly come from puppy mills where caged females stacked several high, soaked in feces are bred until they are too weak to breed. Do not support stores that support puppy mills.