1) The floor was not only unlevel, but the concrete was wavy, so bad that when I put the foam down, the sump wobbled back and forth while hitting the floor bolts.
2) The bolts that the stand contractor used stuck up 1 1/4" I asked if i could cut them down for better clearance, and they wouldn't let me until they hand the building over to the doctors next week.
So rather than using 3 half inch pieces of foam i decided on the wood stand.
|