View Single Post
  #4  
Old 01/06/2008, 09:09 PM
palawan palawan is offline
Registered Member
 
Join Date: Mar 2003
Location: Fremont,CA
Posts: 410
I have been doing the setup that you want to do for over a year with no issues. Go to buckeyefieldsupply.com for the plumbing schematic. The DI output goes to a shut-off solenoid valve into a 1 gallon resevoir. The valve is controlled by a modified JBJ ATO which uses 2 float switches in the resevoir. Since the output from my DI is very low (it takes 45-1hr to fill the resevoir) I had to modify the circuit in the controller to increase the fill time for the JBJ ATO failsafe circuit. The reason to have the resevoir instead of a straight feed to the sump is to prevent TDS creep.