The lower end of the east end, with braces installed and wrapped!
The north and west wall:
The door jam painted. Funny the sticker on the door stated that it would only be warranted if painted within 48 hours of hanging. Oops:
I just had to have better lighting over the sink and the work and fragging areas, so I added some low-volt undercabinet lighting:
Starting to tuck the wires which are all ran through 2" pvc in order to hide the uglies!