LargeJohn
03/18/2004, 11:24 PM
My canopy project is steadily progressing. I have finally finished the staining and sealing. Here is the base without the lid attached. I have the holes cut for 2 cooling fans and the back is open. 3 coats of KILZ on the inside, and stain + 3 coats polyurethane on the outside.
All that is left is to install and wire the lights!:D
PS. These spider reflectors are huge. It's gonna be a tight squeeze to try to fit 2 VHOs next to the halides!
http://home.classicnet.net/stephensj/canopy.jpg
All that is left is to install and wire the lights!:D
PS. These spider reflectors are huge. It's gonna be a tight squeeze to try to fit 2 VHOs next to the halides!
http://home.classicnet.net/stephensj/canopy.jpg